Banyu Urip Field

Facts

Ditemukan tahun 2001
POD di setujui BP Migas 4 Juli 2006
3 Well Pad :
- Well Pad A (9 Sumur Produksi, 4 Sumur Water Injeksi, 1 Sumur Gas Injeksi)
- Well Pad B (11 Sumur Produksi, 5 Sumur Water Injeksi)
- Well Pad C (10 Sumur Produksi, 4 Sumur Water Injeksi,1 Sumur Gas Injeksi)
Kumulatif Produksi Minyak 31 Agustus 2009 – 31 Juli 2022 = 545.116 MMBO
Cadangan Minyak = 940 MMBO, sisa cadangan per 331 Juli 2022 = 394.884 MMBO
Rata-rata Produksi Minyak Januari 2021 - Desember 2021 = 192,320 BOPD
Rata-rata Produksi Gas Januari 2021 - Desember 2021 = 123,216 MSCFD

Facilities

Sour oil and gas processing (45% CO2 and 16% H2S)

- Produced gas used as fueld or re-injected
- Produced water re-injected with raw water (365 KBD water injection)
- 4 x 31.500 bbls crude storage tank
- 5 GTG with 12.7 MW capacity and 1 GTG (12.7 MW back up)

Onshore Pipeline
- 20” Diameter
- 72 km total length
- 900 psig (6205 kPA) @78 deg C Maximum Allowable Operating Pressure
- 1350 psig (9307 kPA) design pressure

View Other Business Operation Field

Kedung Keris Field

Petrogas

Copyright © PT. Petrogas Jatim Utama Cendana - 2024

Responsive Website Design and Development by Mark Design Indonesia.

Responsive Website Design and Development by
Mark Design Indonesia
.